Description
Installation Snapshot
Fix Diamond Dowel sleeves to the first-side formwork at the engineer’s specified spacing and elevation.
- Place and finish concrete on the first side; cure as required.
- Strip formwork; insert Diamond Dowel plates fully into the sleeves.
- Place and finish the second-side pour, ensuring the joint is straight and sleeves remain aligned.
- Cut contraction joints as specified; protect arises (consider armoured joints in high-traffic zones).
Technical Options
Key Advantage | What it Means |
---|---|
Unrestricted joint movement | Prevents restraint-induced cracking while maintaining slab alignment. |
Superior load transfer | Optimizes floor life under heavy wheel and point loads. |
Fast installation | No drilling in formwork; sleeves fix to forms for rapid setup. |
Plate thickness | 6 mm |
---|---|
Typical plate material | Structural steel plate |
Sleeve type | High-strength polymer, nail-on flange for formwork |
Joint movement | Two-way horizontal movement; no vertical differential |
Typical use | Slabs-on-ground, hardstands, high-bay warehouses, logistics hubs |
Finish compatibility | Compatible with armoured joints; suitable under hard-wheeled traffic |